The Langdon Heights Launch Calendar
Preview and launch dates for Langdon Heights will be shared with registered buyers, and each preview invitation reaches them the moment it goes out. The development is planned on Dover Drive in District 05, with about 625 homes planned on 99-year leasehold land. Its planning controls are settled: 13,517.2 m² of land, gross floor area capped at 56,773 m², and a height limit of 160 m SHD.
The land itself already carries a clear history. Each step of the land sale is a matter of public record, and together they show how the site moved from the URA programme to the developer partnership within a few months.
The Land-Sale Timeline Behind Langdon Heights
| Milestone | Date |
|---|---|
| Tender launched by URA | 26 November 2025 |
| Tender closed | 26 March 2026 |
| Site awarded | 31 March 2026 |
In URA’s 2H2025 land list the parcel went by the name “Dover Road”. It passed to CNQC Realty (Prime) Pte Ltd, Forsea Residence Pte Ltd and Jianan Realty Investments (1) Pte Ltd, the partnership of Qingjian Realty, Forsea Holdings and Jianan Capital. Through this tender, the Dover Drive site became the first private residential parcel released in Dover-Medway. The developer page introduces each partner.
Langdon Heights Releases Still to Come
- An e-brochure that introduces the design and its Dover Drive setting.
- Layouts across every residence type.
- The price list.
- Preview invitations, then showflat appointments.
Each release lands with registered buyers on the day it goes out. The latest updates page logs each Langdon Heights milestone in date order, and images published ahead of those releases are artist’s impressions of the development.
Langdon Heights and the Dover-Medway Timeline
URA Master Plan 2025 sets out Dover-Medway as a fresh housing district inside greater one-north, with room for up to about 6,000 public and private homes in all. Langdon Heights rises on the first private residential parcel to come forward there, so its preview opens the private side of that plan.
The surroundings keep moving too. The Circle Line has run as a complete loop since its Stage 6 stations began service on 12 July 2026, and Kampong AI, unveiled by the Ministry of Trade and Industry on 2 March 2026 at JTC LaunchPad @ one-north, is due to be ready by 2028.
Financing Ahead of the Langdon Heights Preview
Payment for a home bought off the plan arrives in staged instalments that track the works on site, opening with 5% for the option; the payment scheme page lists every step. Loan sizing follows MAS rules, with a total debt servicing ratio ceiling of 55% tested against an interest rate of at least 4.0%, and the TDSR calculator runs those numbers for any salary. Showflat viewings are arranged by appointment through the Sales Concierge.
Background reading prepared in November 2026, not financial, legal or tax advice. Duty and loan figures follow the financing pages here; distances are measured as straight lines from the Dover Drive site.